The Basic Task of Oil Processing Plant Layout

Post time:2016-01-19

The Oil Processing Plant Layout usually has its tasks, and this article will introduce it....


The object of Oil Processing Plant Layout is the machinery and all kinds of material which used in the production process( such as raw materials, semi-finished products and finished products, and public system and a variety of media, they according to the nature and morphology of different storage in different places), operation personnel engaged in the production, railway and road various materials pipelines. Usually the Oil Processing Plant Layout is divided into two parts plant layout and plant arrangement, the former is called general layout, the latter is as the workshop layout. The work of the division, this division can make the general professional and professional technology has its own clear scope of work; but in terms of the nature of the work, the two are inseparable as a whole, because they have the same work, but the work of the size of the points, that is, the overall layout of the oil processing plant, and each oil processing plant layout is local. 
 

1. According to the production characteristics, process requirements, transportation and safety and sanitation requirements of the industrial enterprises, combined with various natural conditions and local conditions, reasonable layout of the whole plant building, all kinds of facilities, transportation routes, Determine the location of each other and the specific location, that is, the general layout of industrial enterprises.
 
2. According to requirements of oil processing plant’s natural topography of the site and general layout, reasonable utilization and plant transformation of natural terrain, coordinating field inside and outside the buildings, facilities, traffic routes, namely, vertical arrangement of oil refinery enterprises and earthwork allocation planning.
 
3. Correct choice of field inside and outside the various modes of transport, rational organization of transportation system and processing flow, freight charge. Designed to transport facilities or proposal commissioned to design.
 
4. Reasonable layout of comprehensive field chamber field, underground pipeline engineering technology, so that they do not contradict and conflict.
 
5. To carry out the greening of the oil processing plant and beautify the design or put forward the design requirements, commissioned by the design.
 